Sunday, 29 June 2008

Hot and cold

We had the forces of hot (my id) and cold (air-con men) over at our place today. In case why you wonder i classified him as hot, he actually made the 5 of us wait for him while he rushed over and ended up half hour late. All designers should have the passion in what they do. :P At least I do experienced that when i did my design work. We felt honored and same time guilty, for making the 3 air-con men wait, so I went over Shop N Save to get us some cold can drinks.

Their discussion about the air-con trunking left Jim and I in blurry clouds. We were helpless about how it should be run and how to hide it. We could only leave it in their good hands to join forces and come out with something for us.

After all the ahhs, yes, okies, right...settled, the nice people left and we went over to the nearby fast food place to finalize our quotation. It came up to a hefty sum but we wanted the best for our house, and most probably going to stay for a long time unless we strike 4D, I guessed we could make do with it. We will need to report the defects as well on our door and gate. We decided to close one eye on the minor ones and also not to delay our renovation.

List of defects we found:
1.) Gate hinge is rusty
2.) Gate cannot close properly
3.) Small chip-off on main door
4.) Bomb shelter door dent
5.) Bomb shelter door cannot lock fully
6.) Pen-knife cut on joint of kitchen tiles
7.) Hairline crack on wall at service yard
8.) Rubber seal on window not cropped to length
9.) Cracks on MBR bathroom door
10.) Chip on one toilet tile in MBR Bathroom
11.) Small dent on edge of common toilet door

No comments: